Featured Projects

Here's what we've been working on lately - each project tells its own story, and honestly, we're pretty proud of how they turned out. From compact urban homes to sprawling commercial spaces, we've tackled quite a bit.

Lakeview Residence
Residential

Lakeview Residence

Oakville, ON | Completed 2023

We got the chance to reimagine this waterfront property from scratch. The clients wanted something that'd bring the outside in - y'know, capitalize on those lake views without making it feel like they're living in a fishbowl. Ended up with floor-to-ceiling glass on the south face, cantilevered deck, and this cool double-height living area that just breathes.

Specs at a Glance
  • Square Footage: 4,200 sq ft
  • Structure: Steel frame with concrete foundation
  • Windows: Triple-pane low-E glazing
  • Heating: Radiant floor + geothermal
  • Energy Rating: LEED Gold certified
Timeline & Budget
  • Design Phase: 4 months
  • Construction: 14 months
  • Total Duration: 18 months
  • Budget Range: $2.8M - $3.2M

"We've worked with architects before, but this was different. The team actually listened to what we wanted instead of pushing their own vision. The house functions exactly how we live - not how some textbook says we should live. Plus, our heating bills are basically nothing now."

- Margaret & Tom Chen, Homeowners

Interior View
Deck View
Before Restoration
BEFORE
After Restoration
AFTER
Heritage Restoration

Queen Street Commerce Building

Toronto, ON | Completed 2022

This one was tricky but super rewarding. Original structure from 1889 that'd seen better days - we're talking crumbling brickwork, water damage, the works. Had to get pretty creative with heritage regulations while making it actually usable for modern retail and office tenants. Kept all the original facade details, rebuilt the interior from studs up.

Project Specs
  • Original Build: 1889 (134 years old)
  • Total Area: 8,500 sq ft across 3 floors
  • Structural Work: Foundation underpinning, new steel beams
  • Masonry: 2,400 bricks hand-matched and replaced
  • Timeline: 22 months (including permit delays)
  • Heritage Status: Maintained designated status

"Honestly didn't think it was salvageable when we first bought it. The team found solutions we didn't even know existed - they made the heritage compliance stuff actually work for us instead of against us. Building's gorgeous now and our tenants love it."

- David Kowalski, Property Developer

TechHub Innovation Center
Commercial

TechHub Innovation Center

Mississauga, ON | Completed 2023

Tech startup wanted a space that didn't feel like your typical corporate box. We went with an open concept design but added acoustic pods and flexible meeting zones so people could actually concentrate when needed. Natural light was huge - nobody wants to code in a dungeon.

Key Features
  • Space: 12,000 sq ft open plan
  • Capacity: 85 workstations
  • Special Features: 6 acoustic meeting pods, standing desk zones
  • Sustainability: Solar panels, rainwater harvesting
  • Duration: 11 months design to completion

"Our team productivity went up like 30% after the move. The space just works - natural light everywhere, quiet zones when you need them, collaborative areas that don't echo. Worth every penny."

- Sarah Mitchell, CTO

Residential

Rosedale Laneway House

Toronto, ON | Completed 2023

Laneway houses are having a moment in Toronto, and this was one of our favorites. Tiny lot - like 16 feet wide - but we made it work. Two bedrooms, full kitchen, and somehow it doesn't feel cramped. The trick was going vertical and getting creative with the roofline to maximize the footprint without making it look like a tower.

Specs
  • Footprint: 650 sq ft (2 stories)
  • Lot Width: 16 feet
  • Layout: 2 bed, 1.5 bath, open kitchen
  • Construction: Prefab modular components
  • Timeline: 7 months
  • Energy: Net-zero ready solar array

"We use it as a rental unit and it's been perfect. Tenants love it and it actually added way more value to our property than we spent building it. Smart investment."

- Jennifer & Mark Patel

Laneway House Exterior
Kitchen
Bedroom
Before
BEFORE
After
AFTER
Commercial Interior

Bloor Street Boutique

Toronto, ON | Completed 2022

Fashion boutique needed a total overhaul. Old space was dark and cluttered - killing their vibe. We opened it up, added strategic lighting to highlight merchandise, and created this flow that guides customers through naturally. Sales went up 40% in the first quarter after renovation, which tells you everything.

"The space transformation was incredible. Customers actually linger now instead of just popping in and out. The lighting alone made our products look twice as good."

- Amanda Ricci, Store Owner

More Projects in Progress

We've got a bunch more in the pipeline - can't share all the details yet but here's a peek

Project
In Progress
Multi-Residential
Junction Condos

36-unit mid-rise with commercial ground floor. Breaking ground early 2024. Expected completion late 2025.

Project
In Progress
Residential
Muskoka Retreat

Off-grid lakefront property. Passive solar design with serious insulation. Should be done by summer 2024.

Project
Planning
Public/Commercial
Scarborough Community Hub

Still in design phase but it's gonna be cool - library, co-working space, and community kitchen under one roof.

Want to Start Your Own Project?

Whether you've got detailed plans or just a rough idea, let's chat about it. We're always up for a challenge and honestly, the best projects start with a simple conversation.

Get in Touch